When requesting shower tray and shower base quotations from China, identify the finished-surface or tile-ready scope for each bathroom type. Record the specified material, dimensions, outlet, edge, support, waterproofing interfaces and installation responsibilities for the exact model.
Use these five quotation scopes to prepare a common brief and check each bidder’s actual offer. No factory is named or scored here, and no slip resistance, strength or watertightness is endorsed. Record the project-approved requirements and the review route for the proposed model. For the related interfaces, see shower enclosure and shower door manufacturers, framed and frameless shower enclosures, floor drains and waterproofing membrane manufacturers.
What should a shower tray brief state?
Specify the dimensions, profile, waste, edge and installation scope for each bathroom type using the coordinated drawings. Include the following in every enquiry.
- Size and shape: the size of each tray type from the bathroom plans, its shape and the quantity per bathroom type, with a note of whether the size is the overall size or the finished floor area.
- Height and profile: a low-profile or standard tray, and whether the tray is fitted flush into the floor or stands on top of it.
- Waste: the position and size of the waste outlet as drawn by the plumbing engineer, the trap or channel it connects to, and whether the waste fitting comes with the tray.
- Surface: smooth, textured or tile-ready, with the project-approved slip requirement and the evidence to be supplied for the offered surface.
- Edge: an upstand, a tiling flange or a flush edge, drawn for each side, so that it meets the wall tiles and the enclosure as designed.
- Enclosure: which enclosure sits on or beside the tray and who supplies it, so that the tray edge and the enclosure profile are drawn together.
- Colour and finish: the colour reference and the surface finish, matched to a sample.
- Installation: on a frame or feet, bedded in mortar or adhesive, or set into the floor, with the maker’s installation instructions attached.
- Cutting: whether trays are made to size at the factory or cut to size on site.
- Packing and marking: trays marked by bathroom type and floor, with the protective packing described.
Five sourcing routes for shower trays and shower bases
1. Stone resin and solid surface tray makers
For a resin/mineral or solid-surface tray quotation, request the actual material description, dimensions, surface, underside and edge drawings, waste location and packing. Confirm which custom dimensions are offered for the exact model rather than inferring them from the material label.
2. Acrylic tray makers
For an acrylic tray quotation, request the proposed layer construction, underside support, surface finish and any frame or feet included. Check the model’s installation instructions and size range; the word acrylic does not establish the finished tray’s support or weight.
3. Ceramic and enamelled steel tray makers
For a ceramic or enamelled-steel option, request the body and layer description, proposed finish sample, available dimensions, and edge and underside drawings. Check the offered model against the project’s colour and interface requirements.
4. Tile-ready shower base makers
For a tile-ready base, request the proposed fall and core description, waterproofing arrangement and drain detail for the exact system. Identify factory-supplied parts, site-completed seams or layers and who supplies each component. Record any cutting or alteration limits. See waterproofing membrane manufacturers for the waterproofing scope.
5. Bathroom suite and prefabricated bathroom suppliers
If a tray is quoted with an enclosure, sanitaryware or vanity, list each tray type and component separately. Identify the parties assigned to the interfaces and request supporting documents that identify the product and configuration actually offered.
Sourcing this for a commercial project?
FBM Sourcing manages the entire China procurement package for overseas construction projects. We work with Developers · General Contractors · Builders · Commercial Project Owners · Interior Design & Construction Companies · FF&E Solution Providers. Send your BOQ, drawings or product schedule for review.
How to compare shower tray quotations
- Size basis: whether the stated size is the overall size or the finished floor area, on every line.
- Material and construction: the material and the layers described per model, so a cheaper line is read against what it contains.
- Waste: the outlet position and size, and whether the waste fitting and the trap are included.
- Surface and edge: the surface description and the edge drawing, written against each item code.
- Installation items: frame, feet, adhesive, sealant and waterproofing layer, each listed as included or excluded.
- Units of measure: price per tray per size, and what a tray includes.
- Evidence: which documents are offered for each model and for which size range.
- Exclusions and substitutions: any change of material, size or waste position that the maker proposes.
Compare the construction, dimensions, support, fittings and included installation components on each line before comparing quotation totals.
Matching the tray to the enclosure, the waste and the tiles
Provide coordinated drawings for the tray, enclosure, drain and adjoining finishes. Identify the project’s responsible reviewers for the interfaces and record the approved dimensions, fixing and waterproofing details before requesting quotations.
For a proposed custom size, request a drawing with waste coordinates referenced to identified edges, together with the allowed tolerances. Record approval of those dimensions and any site-adjustment limits by the project’s designated reviewer before production.
Samples, approval and acceptance on delivery
Agree what the tray approval must cover: surface and colour samples, any required full-model sample, dimensions, support, waste, flange and waterproofing interfaces. State which attributes the sample approves and which still require evidence or design review. For custom trays, record the approved dimensions and stated cutting and installation limits.
Agree receiving checks, reporting deadlines and evidence requirements for the delivered trays. Record any differences in size, waste position, surface, edge, quantity or condition against the order. Our own team performs one inspection after bulk production is complete and before shipment, and the client’s project team is welcome to attend. You receive the QC report with photos and video.
What evidence to ask each route for
Request documents that identify the offered model, size and configuration or clearly show how they fall within the represented range. Record the document scope and limitations alongside the quotation.
- Stone resin and solid surface makers: the sample, the drawing of the edge and underside and the documents offered for the exact model.
- Acrylic makers: the description of the layers and the support, and the documents offered for the exact model.
- Ceramic and enamelled steel makers: the description of the body and the glaze or enamel, and a sample of the finish.
- Tile-ready base makers: the list of the layers and the drain assembly, the installation instructions and the documents offered for the exact model.
- Suite suppliers: the maker’s own documents for each exact tray model, not the trader’s summary.
Specification gaps to close before quotation
Record the following project requirements and the bidder’s proposed response before finalising quotation comparisons.
- Is each stated size the overall size or the finished floor area?
- Where does the waste outlet sit on each tray, and who supplies the waste fitting?
- Which slip requirement does the designer state for the shower floor?
- Which edge does each side of the tray take, and which enclosure sits on it?
- Who supplies the waterproofing layer, the adhesive and the sealant?
- How are trays marked by bathroom type and floor, and how are they packed?
Next steps for a shower tray package
Send each maker the same brief and ask for answers in writing, line by line, with samples or documents before bulk production. FBM Sourcing manages China procurement packages for overseas projects; furniture-only packages are also run through FBM Furniture.
Sometimes, on a large project, the shower trays and shower bases alone fill full containers; sometimes the shower trays and shower bases share containers with the other product categories of the same project; and sometimes, in one batch, we combine a dozen or more product categories from several projects of the same client into a few containers — always full containers, and for us this is routine, well-practised work.
Questions buyers ask about shower trays from China
Should a shower tray be quoted with the waste?
Only where the quotation lists it. Ask each maker to say whether the waste fitting and the trap come with the tray, and keep the waste on its own line so that quotations can be compared.
Who decides whether a tray surface meets the slip requirement?
Record the project-approved requirement for the shower-floor surface and identify who reviews the offered evidence. Request documents identifying the model, surface and configuration proposed, or clearly showing the represented range covering them.
Can a tray be made to a custom size?
Ask whether the exact model is offered in the required dimensions and waste position. Agree the drawing, tolerances and any cutting or alteration limits before approving the quotation.
What is the difference between a tray and a tile-ready base?
Specify whether the order requires a finished shower-floor surface or a base to receive a tile finish. For the offered option, identify the base, finish, drain, waterproofing parts and site-completed details in the drawing and quotation.
How does FBM Sourcing support this kind of package?
We review the brief, collect comparable quotations and manage the package for the project. For suppliers you nominate, we charge a 5% commission; for products we source for you, we quote a direct price. Our own team performs one inspection after bulk production is complete and before shipment, and the client’s project team is welcome to attend.
FBM Sourcing manages the entire China procurement package for overseas construction projects. We work with Developers · General Contractors · Builders · Commercial Project Owners · Interior Design & Construction Companies · FF&E Solution Providers.