What Is the IEC 61439 Standard? Parts 1, 2 and 0 Explained
Understand IEC 61439 Parts 1, 2 and 0 in project specifications. Read the distinctions and send drawings and a BOQ for review.
Understand IEC 61439 Parts 1, 2 and 0 in project specifications. Read the distinctions and send drawings and a BOQ for review.
FF&E stands for furniture, fixtures and equipment. See what it covers, how it differs from OS&E and building works, and how a project team schedules and buys it.
Plain-English definitions of FF&E, OS&E, OFOI, BOQ, shop drawings, CFA, Incoterms, landed cost and loading reports, each linked to the guide that explains it in depth.
What 16 CFR Part 1260 says about operating cords on custom window coverings: definitions, stock versus custom, shroud, retraction and loop restraint tests, and the date.
Five sourcing routes for turnstiles and speed gates from China for office, residential and hotel lobbies, from gate makers to integrators, and what to state.
Five sourcing routes for floor transition strips and door thresholds from China, from aluminium profile makers to stone thresholds, and what to state before quotation.
Five sourcing routes for curtain tracks and rails from China for hotels, apartments and care homes, from extrusion makers to motorised systems, and what to state.
What Regulation (EU) 2023/1230 says about machinery scope, importer duties, CE marking and conformity assessment, and its 20 January 2027 start, read from the text.
Five sourcing routes for shower trays and shower bases from China for hotels and apartments, from stone resin makers to tile-ready bases, and what to state.
What Canada’s Corded Window Coverings Regulations say: cord and loop limits, small parts, lead, bilingual labels, the warning and instructions, read from the text.
We coordinate suppliers, production, inspection, and shipping for construction projects worldwide.
Since 2014, FBM Sourcing has managed China procurement for overseas construction projects — building materials and FF&E, from sourcing to after-sales.