End of trip facilities have moved from a nice-to-have to a leasing requirement in commercial office developments across Australia, the UK, and the US. Tenants now expect secure bike storage, showers, changing areas, and lockers as standard — and rating tools reward them. For the developer or contractor fitting out an end of trip facility, the furniture and equipment package is a compact but detail-heavy procurement: lockers, benches, bike racks, vanity joinery, and mirrors, all in materials that survive a wet, high-traffic environment. This guide covers how to source the end of trip facilities package from China at project quality.
What Goes Into an End of Trip Facilities Package
- Lockers: steel or laminate-front, typically 300–450 mm wide doors in single or two-tier configuration, with RFID, combination, or master-keyed locks.
- Changing benches: hardwood or HPL slat benches on steel or stainless frames, wall-fixed or freestanding, often integrated under locker banks.
- Bike racks and repair stations: vertical and horizontal racks, wall rails, and maintenance stands sized to the cycle-parking count.
- Vanity and wet-area joinery: moisture-rated vanity units, mirrors, and shelving for shower and grooming zones.
- Accessories: towel hooks, hair-dryer stations, drying racks, and signage that complete the facility.
The package usually represents 60–200 locker doors plus supporting furniture — comfortably container-scale, and well suited to a single consolidated order rather than five separate suppliers.
Material Choices for Wet, High-Traffic Environments
Lockers: Steel vs Laminate-Front
Powder-coated steel lockers are the durability baseline for back-of-house and budget-driven facilities. Premium end of trip fit-outs increasingly specify laminate-front lockers — a steel or moisture-resistant board carcass with compact laminate (HPL) doors — because they read as joinery rather than industrial equipment. Compact laminate handles humidity well, but the carcass material behind it is where corners get cut; confirm moisture-resistant board grade or steel carcass in writing.
Benches and Joinery
Slat benches should use kiln-dried hardwood or HPL slats on powder-coated or stainless frames — softwood slats in a shower-adjacent zone stain and splinter within months. Vanity units need moisture-rated board, PVC or ABS edge banding, and stainless hardware. These are standard specifications for Chinese commercial furniture factories, but only if they are stated; the factory default is usually a dry-office grade.
Sourcing this for a commercial project?
FBM Sourcing works with project owners, developers, main contractors and FF&E contractors on hotel, apartment, school, office and other commercial building projects. Send us your BOQ, drawings or product list — we’ll come back with a sourcing plan and budget estimate.
Sourcing the Package from China
No single factory makes lockers, benches, bike racks, and vanity joinery. A typical end of trip package draws on three or four specialist plants — steel furniture, solid wood or outdoor furniture, metal fabrication, and panel joinery. This is where a furniture sourcing agent earns its place on the project: one specification document, one sample round, one inspection program, and one consolidated container instead of four uncoordinated part-shipments.
As a china sourcing agent based in Foshan, FBM Sourcing runs this as a single program — factory shortlisting against the architect’s specification, physical samples of the locker door, lock system, and bench slat, mid-production checks on coating and laminate batches, and a pre-shipment inspection that tests lock function against the keying schedule and load-tests bench fixings before anything is loaded. The same consolidation logic applies as with staff locker cabinets and office storage cabinets: one container, one delivery, one installation window.
Budget and Lead Time Expectations
For a mid-size facility — 120 locker doors, 15 metres of bench, 40 bike parking spaces, and wet-area joinery — Chinese factory pricing typically lands at 40–60% of equivalent domestic supply, with production lead time of 30–40 days after sample approval plus sea freight. The saving is real, but it is only banked if the order arrives correct: lock schedules managed, laminate batches consistent, and packing rated for mixed-container loading. Those are inspection outcomes, not quotation line items.
Common Mistakes on End of Trip Furniture Orders
- Ordering lockers from a catalogue without confirming carcass material behind the laminate door.
- Leaving the keying or RFID schedule undocumented until after production.
- Specifying benches by photo rather than by slat material and frame fixing detail.
- Shipping the package as separate part-orders that arrive weeks apart and stall the fit-out program.
- Skipping pre-shipment inspection because each individual item seems simple — the package fails as a system if any component arrives wrong.
Get a China Procurement Quote for Your Project
FBM Sourcing manages end of trip facilities furniture procurement from China for office and commercial developments — lockers, benches, bike racks, and wet-area joinery as one specification, one QC program, and one consolidated shipment. Send us your facility drawings or schedule, locker door count, lock system preference, destination port, and program dates, and we will return a sourcing plan with factory options. Submit your project requirements to start your inquiry.