What Should You Check Before Ordering Entry Doors for a Project? 3 QC Checks
Three checks before entry doors ship for a project: pivot hardware load-rated and shimmed dead level to the floor spindle, smart locks facto…
Watch & read transcript →Pre-shipment inspection videos from real commercial project orders. Our own team checks every unit against the signed drawings and material list — dimensions, finish, hardware and function — before packing, then again before container loading, and the client receives a photo-and-video inspection report before shipment. These clips show what that looks like on doors, windows, cabinets, tiles, lighting and furniture sourced from China for hotels, apartments, offices and schools.

Three checks before entry doors ship for a project: pivot hardware load-rated and shimmed dead level to the floor spindle, smart locks facto…
Watch & read transcript →
Before aluminum windows ship for a US commercial project we check 100% of units — profiles against shop drawings, glazing against the window…
Watch & read transcript →Shorts

One wrong cutout means a plumber standing idle on your site. Quartz countertop QC on a project order: every piece matched against its order…
Watch & read transcript →
Every fixture for a commercial project gets a full light-up test inside the export crate before the lid closes: drivers wired and checked, e…
Watch & read transcript →
Drop water on the back of a tile and wait 60 seconds: true porcelain absorbs 0.5% or less, so the water beads instead of soaking in. That is…
Watch & read transcript →Planning a hotel, apartment building, office or other commercial project?
For full-container projects, send us your drawings and BOQ. FBM Sourcing manages the entire China procurement package for overseas construction projects.