
Short answer
One wrong cutout means a plumber standing idle on your site. Quartz countertop QC on a project order: every piece matched against its order at the sorting tables, edges and surface checked piece by piece, and dimensions and cutout positions verified against your approved shop drawings before crating.
Full transcript
Every one of these quartz countertops is cut to a specific kitchen drawing — and one wrong cutout means a plumber standing idle on your site. So here is the QC that matters on a project order. Each piece is matched against its order at the sorting tables. Inspectors go over edges, cutouts and surface finish one by one. And before crating, we verify dimensions against the approved shop drawings and confirm cutout positions for your actual sinks and hobs.
Fitting out apartments or a hotel? Send us your drawings and BOQ — link below.
Planning a hotel, apartment building, office or other commercial project?
For full-container projects, send us your drawings and BOQ. FBM Sourcing manages the entire China procurement package for overseas construction projects.
More videos

What Should You Check Before Ordering Entry Doors for a Project? 3 QC Checks
Three checks before entry doors ship for a project: pivot hardware load-rated and shimmed dead level to the floor spindle, smart locks facto…
Watch & read transcript →
What Does a China Sourcing Agent Check Before Windows Ship? QC to Loading in 3 Days
Before aluminum windows ship for a US commercial project we check 100% of units — profiles against shop drawings, glazing against the window…
Watch & read transcript →Shorts

Why Is Every Fixture Light-Tested Before the Export Crate Closes?
Every fixture for a commercial project gets a full light-up test inside the export crate before the lid closes: drivers wired and checked, e…
Watch & read transcript →